INDEX / SVC.04 CNC / SVC.04.C — PRODUCTION DOCUMENTATION & DETAILING

The paperwork that makes a part repeatable.

Setup sheets, tool lists, operation drawings and inspection documents — the production pack that lets any operator run the job and any inspector prove it, long after the programmer has moved on.

SOLIDWORKSAUTOCADMASTERCAMFUSION 360INVENTOR
++
160.0 ±0.3PIANO HINGE — HAFELE 351.20.8382MM ALUMINIUM · 1.15 KG
FIG.42 — BATTERY BOX OPS · REV.C
CLICK TO EXPLODE / ASSEMBLE
BATTERY BOX OPSREV.CFIG.422MM ALUMINIUM · 4 SETUPSSCALE 1:2SHT 1/6
SVC.04.C — DOCUMENT INDEX, SEVEN LINES

Documented once,
run by anyone

SETUP SHEETS, TOOL LISTS AND INSPECTION RECORDS THAT SURVIVE A CHANGE OF OPERATOR
.01Setup Sheets & Work Offset RecordsDatum locations, G54–G59 offsets, vice orientation and stock size dimensioned and illustrated — the job loads the same way every time.
.02Tool Lists & Holder SchedulesTool number, cutter geometry, stick-out, holder assembly and expected tool life listed per operation, matched to your crib numbering.
.03Operation & In-Process DrawingsA dimensioned sheet per operation showing the part as it leaves that setup, so intermediate stock and machining allowance are never guessed.
.04Inspection Documents & Balloon DrawingsBallooned drawings with a matching characteristic table, ready for first-article inspection and formatted for your quality system.
.05GD&T & Datum Scheme ReviewDatum structures and tolerance callouts checked against ASME Y14.5 or ISO GPS — ambiguity resolved before it becomes a rejected part.
.06Weld, Assembly & Fabrication DetailingWeld symbols, joint preparation and assembly sequences detailed so a fabricated part is built the same way on every shift.
.07Revision Control & Drawing RegistersTitle blocks, revision clouds and a maintained drawing register, so the sheet at the machine is provably the current issue.
PROCESS — FOUR CHECKPOINTS

How a production pack is built

STEP.01
Model & standard audit
Your model, drawing standard and title block are reviewed first. We document to your template, not to ours.
STEP.02
Operation breakdown
The part is split into setups and operations, with datums, work-holding and machining allowance agreed before any sheet is drawn.
STEP.03
Detail & check
Sheets are detailed, then independently checked against the model — dimensions, tolerances and callouts verified line by line.
STEP.04
Issue & maintain
The pack issues as native CAD plus PDF, with the drawing register kept current through every revision that follows.
SECTORS —METAL FABRICATIONMACHINE MANUFACTURINGAEROSPACEAUTOMOTIVEMEDICAL DEVICESOIL & GASPROCESS INDUSTRY

Packs we've issued

ALL WORK →
DROP RENDER — FIG.112
BATTERY BOX OPERATION SETFIG.112
DROP RENDER — FIG.113
FIXTURE PLATE DRILL PACKFIG.113
DROP RENDER — FIG.114
BALLOONED FAI DRAWINGFIG.114
DROP RENDER — FIG.115
GEARBOX SETUP SHEET SERIESFIG.115
DROP RENDER — FIG.116
WELDED FRAME DETAIL PACKFIG.116
DROP RENDER — FIG.117
TOOL LIST & CRIB REGISTERFIG.117
OUR CLIENTS — ON THE RECORD

Signed off, worldwide

REG.014 — SIGN-OFF
Very well thought out and articulate communication. Clear milestones, deadlines and fast work. No shortcuts. The best part — always solving problems with great original ideas.
COURTNEY HENRYCUSTOMER IN U.S.A
ORIGINUSASERVICEPRODUCTION DOCUMENTATIONSTATUSAPPROVED ✓
SHT 1 / 3
RFI LOG — MOST FREQUENT QUESTIONS

Before you ask

Work offset and datum location, vice or fixture orientation, stock size, the tool list for that operation and a view of the loaded setup. Enough for a cold start on any shift.

Parts running without
a proper job pack?

NDA-FIRST · SCOPED WITHIN 24H · NAMED ENGINEER